Line 1 (Dongguan Rail Transit)
Line 1 of the Dongguan Rail Transit, (Chinese: 东莞轨道交通1号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Yī Hào Xiàn), is a rapid transit line under construction in Dongguan, Guangdong. It has a planned 25 stations and connect Machongxi in the North, to Huangjiangnan in the south.
| Line 1 | |
|---|---|
| 1 | |
| Overview | |
| Other name(s) | R1 |
| Status | Under Construction |
| Locale | Dongguan, Guangdong |
| Termini |
|
| Stations | First phase: 25 |
| Service | |
| Type | Rapid transit |
| System | Dongguan Rail Transit |
| Operator(s) | Dongguan Rail Transit Corporation, Limited (东莞市轨道交通有限公司) |
| History | |
| Opened | 2026 (Planned) |
| Technical | |
| Line length | 58 km (36.04 mi) |
| Number of tracks | 2 |
| Character | Underground and elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Phase 1 of Line 1 in Dongguan will start construction in September 2018.[1] The extension to Huangpu Passenger Port have not approved by National Development and Reform Commission and has no published timeline.
Stations
| Station name | Connections | Distance km |
Location | Section | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Huangpu Passenger Port | 黄埔客运港 | Huangpu (Guangzhou) | ||||
| Machongxi | 麻涌西 | Dongguan | ||||
| Machongdong | 麻涌东 | |||||
| Wanghong | 望洪 | GH SS FG | ||||
| Daojiao | 道滘 | |||||
| Daojiaodong | 道滘东 | |||||
| Renmin Hospital | 人民医院 | |||||
| Wangjiang Coach Terminal | 汽车总站 | |||||
| Binjiang Sports Center | 滨江体育馆 | |||||
| Guantai Road | 莞太路 | |||||
| Hongfu Road | 鸿福路 | 2 | ||||
| Xinyuan Road | 新源路 | |||||
| Dongchengnan | 东城南 | |||||
| Shuilianshan | 水濂山 | |||||
| Dalingshanbei | 大岭山北 | |||||
| Dalingshan | 大岭山 | |||||
| Dalingshandong | 大岭山东 | |||||
| Songshanhu | 松山湖 | 3 | ||||
| Dalangxi | 大朗西 | |||||
| Dalang | 大朗 | |||||
| Shidi Park | 湿地公园 | |||||
| Huangjiangbei | 黄江北 | |||||
| Huangniupu | 黄牛埔 | |||||
| Huangjiang Center | 黄江中心 | 4 | ||||
| Huangjiangnan | 黄江南 | |||||
See also
References
- "Dìngle! Dōngguǎn zhè tiáo dìtiě xiàn, jīnnián 9 yuè zhèngshì dònggōng" 定了!东莞这条地铁线,今年9月正式动工. news.timedg.com (in Chinese). 2018-04-06. Archived from the original on 2018-07-16. Retrieved 2018-07-15.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.